Marina Complex, Florida
Our client is an international designer, manufacturer, and installer of marina facilities. We act as their national litigation counsel and general counsel. We have handled cases, in and out of litigation, including a multimillion-dollar claim arising out of damage to a marina after construction. Damage was due in part to faulty construction of the sea walls, work that was not performed by our client. There were allegations—ultimately unproven—of underdesign or inappropriate design. Through a mediation process with an experienced construction mediator, we were able to obtain a positive outcome in a matter that could have been extremely expensive if it had proceeded to trial.