Menu
University Stadium
Mr. Coleman represented a national architect/engineer in defense of a $20 million claim by a major university against the designer (our client) and contractor arising out of the tear-out and replacement of the concrete concourse diaphragm slab for the football stadium and other defects in concrete construction. Claims included alleged errors in design of lateral load system and numerous defects in concrete construction and design. The case was settled in mediation.
Client Comments
More Client Comments